Our skilled installation team successfully applied thousands of square feet of shrink wrap to protect the waterways during the repainting and structural repairs of the Peace River Bridge. This environmentally responsible solution ensured that no debris or contaminants entered the water, while also creating a controlled environment for the painting crew, allowing them to work efficiently in a weather-resistant space. This method not only safeguarded the surrounding environment but also contributed to the overall durability and quality of the project.